Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium

20.07.2016, Issue 3/ / /

  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium
  • Reconstruction of the HVAC installation in the newly opened sector A of the Georgi Asparuhov Stadium

 


› Advertising
› Advertising





 

 

MORE PUBLICATIONS ON THE TOPIC

Vento-K, Georgi Spasov: We are planning to expand the range of HVAC equipment manufactured by us

Vento-K, Georgi Spasov: We are planning to expand the range of HVAC equipment manufactured by us

Ventilation, air conditioning and domestic hot water

Ventilation, air conditioning and domestic hot water

Hybrid air handling units with two-tier heart recovery

Hybrid air handling units with two-tier heart recovery

Air handling units with heat recovery

Air handling units with heat recovery


 

Development by от AM Design. TD Installations Magazine. TLL Media © 2024 All rights reserved. Sitemap.

Top